top of page
SMT assembly equipment at BETLY's Shenzhen partner factory

PCBA Manufacturing Through Our Shenzhen Partner Factory

Engineering-driven manufacturing coordination for industrial electronics, from prototype builds to production orders.

​

BETLY connects engineering review, component sourcing and PCBA assembly through a trusted manufacturing partner in Shenzhen, China.

Manufacturing Processes Matched to Your Project

Our Shenzhen manufacturing partner supports a range of PCB assembly processes for industrial electronic products. Process requirements are reviewed according to the product design, BOM and agreed project scope.

SMT production equipment at BETLY's Shenzhen partner factory

SMT Assembly

Surface-mount component placement and reflow soldering for PCB assemblies, with process requirements determined by the product design and BOM.

PCB assembly staff at BETLY's Shenzhen partner factory

Through-Hole Assembly

Through-hole component insertion, wave soldering and manual soldering for components and assemblies that require these processes.

Manual assembly workstations at BETLY's Shenzhen partner factory

Manual Soldering & Rework

Manual soldering and rework activities are performed where technically appropriate and within the agreed production and quality requirements.

Engineering Review Before Manufacturing

Successful PCBA production begins with clear technical requirements and material readiness.

BETLY coordinates with the customer and manufacturing partner to review:

  • BOM completeness and component availability

  • PCB fabrication and assembly requirements

  • Potential DFM concerns

  • Approved component alternatives

  • Production documentation and technical clarifications

Any component substitution requires technical evaluation and written customer approval before implementation.

Electronics engineering workstation with circuit boards and test equipment
微信图片_20260617144649_605_96.jpg

One Point of Contact. Clear Production Communication

BETLY acts as the coordination point between international customers and our Shenzhen manufacturing partner.

​

We help manage technical clarification, component sourcing updates, production readiness, scheduling communication and quality-related follow-up.

​

Production lead times are confirmed according to component availability, assembly complexity, order quantity and factory capacity.

Our coordinated workflow typically follows a production cycle of 5–7 business days after materials arrive.

Inspection and X-ray area at BETLY's Shenzhen partner factory

Quality Checks Based on Agreed Requirements

Inspection and testing requirements are reviewed and agreed according to the complexity and application of each PCBA project.

​

Inspection coverage is defined per product in an agreed test plan: SPI, AOI, X-ray, first-article inspection, and functional testing when agreed.

Acceptance criteria, test procedures and required documentation are confirmed before production where applicable.

工業大廈

Planning Your Next PCBA Build?

Share your Gerber files, BOM, assembly requirements and estimated order quantities.
We target an initial BOM and DFM screening response within 3–4 business days after receiving usable project files.
This is an initial review to identify potential manufacturing and sourcing considerations, not a comprehensive engineering assessment.

bottom of page